|

Thurston High School
Performing Arts Center
and Auditorium
July 2007
photos by:
Judy Considine, Communications Coordinator |
|

Principal, Mr. Zolkowski, takes a tour of the
Performing Arts Center construction project in early July 2007. |

Entrance to the Performing Arts Center and
Auditorium. |
|
   
Above right: Camille Grayson, Gwen McIntosh,
Bill Zolkowski and Jim Finn tour the new Performing Arts Center with
Auch construction project manager. The photo was taken in the main
entrance of Thurston; at the right is the ticket area and entrance to
the new auditorium. On the left is the front office. |
|

Camille Grayson watches from auditorium
entrance as the earth is compacted in preparation to pour cement steps.
Click on photo above for QuickTime video clip. |

Click on photo above for QuickTime clip.
|
|
|
|

A temporary bridge was built connecting the stage area to the auditorium
providing machinery access. The orchestra pit is below the bridge.
Click on photo above to view QuickTime video clip.
|

Pictured above: Lighting and sound room taken from the balcony. |
|

View of the orchestra pit from the cat walk.
|

View from cat walk. |
|

Check your coat, sir?
Bill Zolkowski and Jim Finn in coat check area. |

Hallway to stage and behind the stage area.
|
|

Construction crew prepares the area behind the stage for steel beams.
|

Camille Grayson and Gwen McIntosh
tour the new Performing Arts Center. |
| |
|
|

|

Click the photo above to view a presentation
with additional photos. |
|

Front entrance of Thurston gymnasium. |

New gym flooring was delivered in July 2007. |
|

Entrance to gymnasium. The clock on the wall
above the doors was from the class of 1953 and was recently refurbished
by the class of 2007. |

View of gym doors leading to parking lot.
|
| |
|
|
Thurston campus is still a construction area, please drive safe. |
Mr. Z in Thurston's front hallway, he has a lot to smile about. |
|
|
|